Beira Coal Terminal
Through operational improvements and efficiencies Nectar has increased the capacity of the terminal by 20%.
Terminal Management
In managing the coal terminal, Nectar is responsible for all of the activities within the terminal from unloading of coal from the trains up to loading of the vessels including maintenance of all terminal equipment. The coal is transported by train from the mining area to the port which is approximately 575 km away. On reaching the Port, the coal is offloaded by excavators and transferred on to a conveyor system and stacked on to the stockpile by a stacker.
Terminal Design
Nectar Group has been active in Mozambique ports since the 1980's. Over the years, Nectar has worked in close co-operation with the Mozambique Port Authorities and port Concessionaire companies.
In addition to various services that Nectar is already providing, the Group has also been appointed to operate and maintain the coal export terminal. The project involves the building of a new terminal on the site of an old installation which was used many years ago. Together with the concessionaire company, Nectar has been involved in providing assistance during the construction of the coal terminal in relation to various areas including operational and technical management issues
Discover Our Outstanding Capabilities.
اتصل بنا
1 بوابة أشتون ، طريق أشتون.
هارولد هيل ، رومفورد
اسيكس. RM3 8UF
<i class="fas fa-at"></i> commercialteam@nectar.co.uk
فرص العمل: HR@nectar.co.uk
<i class="fas fa-phone"></i> +44 (0)1708 386555
* تشير إلى حقل مطلوب